RECENT WORK

IP Pineville

Project Name: IP Pineville
Location: Pineville, Louisiana
Start Date: 2011
End Date: 2012
Project Type: Paper & Pulp
Project Cost: $$
Services Used:
Project Description
Set on 1200 acres, the plant was powered by a 25MW steam turbine fueled by bark and natural gas. Scope of work included demolition of all process areas, asset recovery, scrap reclamation and asbestos abatement. The eight-story recovery boiler and a second boiler were removed, together with a paper machine, lime kiln, caustic plant and two pulp washer lines. Work performed included the tripping of a boiler, precipitator and stack.